# Primavera P6 Tips and Tricks PDF

**URL:** <https://almohandes.org/t/primavera-p6-tips-and-tricks-pdf/191372>\
**Category:** إدارة المشروعات الهندسية\
**Created:** [9 مارس 2019، 8:57م UTC](https://almohandes.org/t/primavera-p6-tips-and-tricks-pdf/191372 "2019-03-09T20:57:47Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![Hosny600](https://almohandes.org/letter_avatar_proxy/v4/letter/h/f4b2a3/32.png) [@Hosny600](https://almohandes.org/u/Hosny600)\
**Post date:** [9 مارس 2019، 8:57م UTC](https://almohandes.org/t/primavera-p6-tips-and-tricks-pdf/191372/1 "2019-03-09T20:57:47Z")

</div>

## Overview:

This PDF contains Primavera P6 Tips And Tricks, which defines the types of activity dates available in the module and how they are used to plan and schedule your project.

## **Top Primavera P6 Tips And Tricks & Primavera P6 Shortcuts**

## **1-Find Your Activities In Primavera P6**

To search for activities manually is time-consuming & impractical. You can use **Ctrl + F** to search for the activity name within your activities.

## **2-Use F9 To Schedule In Primavera P6**

One of Primavera P6 Tips And Tricks is when you want to run a Schedule for your project, you need to click on at least three different buttons. However, pressing **F9** will take you to the Schedule immediately. Moreover, this function will show the changes within the schedule, which is a perfect tool for reviewing entries for errors & missing information.

## **3-Close Open Projects In Primavera P6**

One of top Primavera P6 Shortcuts is when you want to close any open projects, you just need to click on Ctrl+W

## **4-Link Activities (Creating Finish To Start “FS” Relationship) In Primavera P6**

One of most useful Primavera P6 Tips And Tricks is when you want to create Finish To Start relationship between activities, you just need to click in two activities or more and right click and then click on **Link Activities.**

## **5-Check Open End Activities**

One of Primavera P6 Tips And Tricks is to check and remove open ends in the activity network. A good starting point is to look for the list of activities without successors/predecessors in the Scheduling/Leveling Report, which can be shown on the Schedule window (F9 or Tools \>Schedule\>View Log).

## **Primavera P6 Tips And Tricks Video:**

[![](https://almohandes.org/uploads/default/original/3X/b/c/bc62e85d72b489972380bc71352e14113141585f.jpeg "Critical Path Analysis in P6 - 5 Things I Wish I Knew Earlier") ](https://www.youtube.com/watch?v=9HJV9037tX4)

التحميل  
[Primavera-Basics-Tips-and-Tricks.pdf](https://almohandes.org/uploads/default/original/3X/b/f/bf9997f0e1fb07fe13c6893894f7c8e8cc6cde15.pdf) (517.7% u)

أو  
[https://dropfilez.com/ZOqBJSU](https://dropfilez.com/ZOqBJSU)

المصدر  
[https://bibloteka.com/primavera-p6-basics-tips-and-tricks/](https://bibloteka.com/primavera-p6-basics-tips-and-tricks/)